Peel, Regional Municipality of

Projects and bid results published under this name. If a province doesn’t release bid results, the bidding numbers here will be blank.

Projects
68
6 still underway or upcoming
Value on record
$0.3 B
Tenders with bids
—
68 tracked projects

Largest projects

ProjectStageValue ($M)Prov.
Replacement of Old Watermains in the City of Mississaugacomplete37ON
Replacement of Old Watermains in the City of Bramptoncomplete25ON
Implementation of Improvements to the Water Supply System in Mississaugacomplete18ON
Replacement of Water Mains in Peelcomplete15ON
Construction of a New 750-mm Water Main on Goreway Drivecomplete10ON
Electrical Upgrades at the Hanlan and Herridge Pumping Stationscomplete10ON
Peel Heritage Complex Expansion and Revitalizationcomplete10ON
Equipment Replacement at the G.E. Booth Water Pollution Control Plantcomplete9.8ON
Police Fleet Garage and Inventory Storescomplete9.0ON
East Sanitary Trunk Sewer and EDC Rehabilitationconstruction8.0ON
Condition Assessment of the Region's Storm Sewer Infrastructurecomplete8.0ON
Port Credit Trunk Sewer and Forcemaincomplete8.0ON
Meadowvale North Pumping Station Expansioncomplete7.5ON
TransHelp Life-Cycle Bus Replacement Projectconstruction7.2ON
Replacement of the Existing 400-mm Water Main on Hurontario Street with a 750-mm Water Maincomplete7.0ON
Design for a New Sanitary Trunk Sewer on Cawthra Roadcomplete7.0ON
Equipment Replacement at the Water Transmission Facilitiescomplete6.6ON
Capital Improvements to the Pumping Station at the Lorne Park Water Treatment Plantcomplete6.4ON
Resurfacing - Dixie Road from Highway 401 to Derry Roadcomplete6.2ON
Rehabilitation or Replacement of Various Sewage Pumping Stations in the Region of Peelcomplete6.0ON
Water servicing for the communities of Campbell’s Cross and Victoria in Town of Caledoncomplete5.2ON
Construction of a New 400-mm Water Main on Dundas Street Westcomplete5.0ON
Clarkway Drive Trunk Sewercomplete4.7ON
Implementation of Hydraulic Improvements at the East Brampton Reservoircomplete4.5ON
McVean Drive Trunk Sewercomplete4.5ON
TransHelp Life-Cycle Bus Replacement Project #2announced4.2ON
Interconnection of Caledon East and Palgrave Water Systemcomplete4.2ON
Upgrades to the Generator Programmable Logic Controllers (PLC) at Various Lake-Based Water Transmission Facilitiescomplete4.0ON
Resurfacing - on the Forks of the Credit Road from Hurontario Street to Westcomplete3.9ON
Silverthorn pumping station improvements and upgradescomplete3.3ON
Resurfacing - Airport Road from Steeles Avenue to Queen Streetcomplete3.2ON
Installation of Additional Flow and Pressure Monitoring for the Lake-Based Water Supply Systemcomplete3.0ON
Equipment Replacement at the Lakeview water treatment plantcomplete2.9ON
Interior Reservoir Coatings - Hanlan South Reservoir Cellcomplete2.2ON
Rehabilitation of the Storm water Pond at Bovaird Drive West & Gillingham Drivecomplete2.0ON
Design for the Replacement of the Ash Management Facility at the G.E. Booth Water Pollution Control Plantcomplete2.0ON
Equipment Replacement at the Clarkson Water Pollution Control Plantcomplete2.0ON
TransHelp PRESTO Fare System Adoption Projectannounced1.5ON
Design for a New Sanitary Trunk Sewer on Lakeshore Road Westcomplete1.5ON
Construction of a 300-mm Water Main on Mount Pleasant Roadcomplete1.5ON
Replacement of Roof Membrane at Beckett Sproule Reservoircomplete1.5ON
Reservoir Rehabilitation Project - Silverthorn Reservoircomplete1.5ON
Equipment and electrical systems Replacement at the Lorne Park Water Treatment Plantcomplete1.3ON
Major Rehabilitation and Repair Works to Municipal Facilities at Copper Roadcomplete1.3ON
Lionhead Pumping Station, Decommissioning and Gravity Sewer Connectioncomplete1.2ON
Resurfacing - Highway 50 from Countryside Drive to Coleraine Drivecomplete1.2ON
Retrofit Common Area Spacescomplete1.2ON
Reservoir Rehabilitation Project - East Brampton cells 3 and 4complete1.2ON
Interior Reservoir Coatings - Meadowvale Cells 1 and 2complete1.1ON
TransHelp Battery Electric Busesannounced1.0ON
Peel Art Gallery Museum and Archives (PAMA) Building 9 HVAC remediation and envelope upgradecomplete1.0ON
Resurfacing - Cawthra Road from Lakeshore Road to North Service Roadcomplete1.0ON
Resurfacing - Mayfield Road from McLaughlin Road to Mississauga Roadcomplete0.9ON
Malton Paramedic Satellite Stationcomplete0.8ON
Dixie Road Repairscomplete0.7ON
Reservoir Rehabilitation Project - East Brampton cells 1 and 2complete0.6ON
Rehabilitation of the Stormwater Pond at Mayfield Road and Kennedy Roadcomplete0.6ON
Intermodal Sewage Pumping Station Enhancementscomplete0.6ON
Installation of an Emergency Shutoff Valve in the Chlorine Building at the Lakeview Water Treatment Plantcomplete0.5ON
Replacement of Ultraviolet (UV) Disinfection Equipment at Alton Wells 3 and 4complete0.5ON
Rehabilitation of the Stormwater Pond at Mayfield Road and Heart Lake Roadcomplete0.4ON
Resurfacing - King Street from Creditview Road to Mississauga Roadcomplete0.4ON
Replacement of the Heart Lake Conservation Area Water Supply Systemcomplete0.4ON
System Evaluation and Implementation of Green Infrastructure for Stormwater Managementcomplete0.2ON
Gore Road Rehabilitationcomplete0.2ON
Studies to Improve Water Quality Control for Small Watercourses Draining Directly to Lake Ontariocomplete0.1ON
Study for New Water and Wastewater Servicing for the Belfountain Conservation Areacomplete0.1ON
Transportation Master Plan - Region of Peelannounced0.1ON