London, Corporation of the City of

Projects and bid results published under this name. If a province doesn’t release bid results, the bidding numbers here will be blank.

Projects
100
19 still underway or upcoming
Value on record
$0.7 B
Tenders with bids
—
100 tracked projects

Largest projects

ProjectStageValue ($M)Prov.
Wellington Gateway Projectconstruction184ON
HELP Clean Water (Huron Elgin London Project)complete176ON
East London Linkconstruction76ON
Wastewater Treatment Plant Flood Protection Projectconstruction50ON
Expansion Busesconstruction25ON
Downtown Loopconstruction21ON
Intelligent Traffic Signalsconstruction20ON
Adelaide Street Underpass Active Transportation Connectionscomplete19ON
Rehabilitation of Dundas Placecomplete16ON
Shift Rapid Transit Pilot Project & Implementationcomplete15ON
New Cycling Improvements Along London Streetsconstruction14ON
Sewer Separation Program Acceleration -Design and Constructioncomplete10ON
Broughdale Dyke Reconstruction Projectannounced9.1ON
Dundas Street Old East Village Streestscaping Improvementsconstruction8.2ON
Design and purchase of Organic Rankine Cycle equipment for Power Generation and Waste Heat Recovery Systems & Biosolids Optimization at Greenway Pollution Control Plantcomplete5.9ON
Design and Construction of Flood Protection Measures at the Vauxhall Pollution Control Plantcomplete4.7ON
South Branch Thames Valley Parkway Extensionconstruction4.5ON
Intersection Accessibility Improvementsconstruction4.3ON
Dundas Place Thames Valley Parkway Active Transportation Connectionconstruction4.0ON
Increased bus replacement program in 2018 to include 7 buses planned for 2019 replacementcomplete4.0ON
Increased bus replacement program in 2017 to include 7 buses planned for 2018 replacementcomplete4.0ON
Nichols Arena Deep Energy Retrofitannounced3.6ON
Treatment Plant Energy Reduction With Turbo Blowers - Supply and Installcomplete3.4ON
Design and construction of odour control upgrades at 5 Treatment Plants across the Citycomplete3.3ON
Shift Rapid Transit Environmental Assessment (EA) / Transit Project Assessment Process (TPAP)complete3.0ON
Kinsmen Arena Deep Energy Retrofitannounced2.7ON
Sewer Separation and Infrastructure Renewal - Planning and design for future projects and construction of one high priority projectcomplete2.7ON
Replacement of all 380 bus shelters currently in place in the City of Londoncomplete2.6ON
New Cycling Facilitiescomplete2.3ON
Purchase and Install Solids and Floatables Management equipment at 8 Locations (Pumping Stations and Treatment Plants)complete2.2ON
Kiwanis Park Pathway Connectioncomplete2.1ON
Upgrades to Labatt Parkconstruction2.0ON
New Accessible Transit Pads and Sidewalkscomplete2.0ON
Dundas Place Transit Improvementscomplete2.0ON
Carling Heights Optimist Community Centre - Teaching Kitchen & Elevatorawarded1.9ON
Construct New Downtown Cycle Trackscomplete1.8ON
Byron Baseline and Wonderland Road Sidewalk and Bicycle Facilitiescomplete1.8ON
Facility Infrastructure Renewal Programcomplete1.6ON
New Pedestrian Crossingsconstruction1.5ON
Design and Construction of Technology Upgrades (Supervisory Control and Data Acquisition (SCADA) and Security) at 30 Wastewater and 14 Water locations across the Citycomplete1.5ON
Rehabilitate & Upgrade Blackfriars Bridge Active Transportation Componentscomplete1.5ON
Old East Village Shift Rapid Transit Route Parking Lot Improvementscomplete1.3ON
Separated Bicycle Lane Renewalcomplete1.3ON
Retrofit current bus fleet (110 buses) with perimeter seating to increase accessiblitycomplete1.1ON
Bus Stop Amenitiescomplete1.1ON
Boulevard Bicycle Path Improvementscomplete1.1ON
Sewer Relining Program Acceleration - Design and Constructioncomplete1.1ON
Rehabilitation of Thames Valley Parkway (TVP), South Branchcomplete1.0ON
Replacement of 10 engines and related ancillary equipment in buses that have surpassed the planned 6 year replacement cyclecomplete0.9ON
Trunk Watermains Syphons and Pipeline - Inspections and Condition Ratingcomplete0.9ON
Replacement of transmissions for 8 Diesel busescomplete0.8ON
Watermain Cleaning and Relining - Design and Constructioncomplete0.8ON
Rehabilitation of Thames Valley Parkway (TVP), Main Branchcomplete0.8ON
Replacement batteries for 8 Hybrid buses currently in fleetcomplete0.7ON
Replacement of bus wash infrastructure at Highbury Transit Facilitycomplete0.7ON
Installation of 25 (minimum) New Pedestrian Crossingscomplete0.7ON
Purchase and Installation of Variable Frequency Drives at 4 Sanitary Pump Stationscomplete0.7ON
Rehabilitation of 3 Pedestrian Bridgescomplete0.6ON
Purchase and installation of 72 Automatic Passenger Counters for remainder of bus fleetcomplete0.6ON
Replacement of the Autotechnik Joints for 9 articulated buses in the fleetcomplete0.6ON
Applegate Stormwater Management Facilitycomplete0.5ON
Construct Bradley Avenue Extension Transit and Active Transportation Featurescomplete0.5ON
Replacement Dual Power Invertor Modules for 8 Hybrid busescomplete0.4ON
Replacement of (2) hoists at Highbury transit facilitycomplete0.4ON
Asphalt repairs at both transit facilitiescomplete0.4ON
Replacement of existing 8-line wayside transit information signscomplete0.4ON
12 Audible Pedestrian Signal Upgradescomplete0.4ON
Cathodic Protection Program - Inspection, Design and Constructioncomplete0.4ON
Design for Water, Wastewater and Stormwater Infrastructure Renewal in Londoncomplete0.4ON
Upgrade of on-board bus audio/video recording systemcomplete0.3ON
Supply and installation of 35 wayside transit information signs at identified locations across the Citycomplete0.3ON
Upgrade lighting to Light-emiting diodes (LED) at both transit facilitiescomplete0.3ON
Downtown Sidewalk Improvementscomplete0.3ON
Completion of a Facility needs Assessment and detailed plan for Highbury Transit facilitycomplete0.3ON
Replacement of current telephone system in use at London Transitcomplete0.3ON
Trunk Watermain Cathodic Protection Upgrades - Design and Constructioncomplete0.3ON
Upgrade Automatic Vehicle Location/Communication System utilized at London Transitcomplete0.2ON
East London - Sanitary Servicing Studycomplete0.2ON
Upgrades to File Server and Network Switching Infrastructure in Use at the Highbury Transit Facilitycomplete0.2ON
New Bicycle Parkingannounced0.2ON