Canadian Infrastructure Atlas
/
65,333 projects from 14 public sources · updated 2026-09-30 · sources · what’s covered
Owners

Hamilton, City of

Projects and bid results published under this name. If a province doesn’t release bid results, the bidding numbers here will be blank.

Projects
73
23 still underway or upcoming
Value on record
$1.2 B
Tenders with bids
—
73 tracked projects

Largest projects

ProjectStageValue ($M)Prov.
Improvements to the Woodward Avenue wastewater treatment plantconstruction337ON
New Maintenance & Storage Facilityconstruction204ON
Replacement of Transit Fleetconstruction114ON
Hamilton Harbour Clean-Upcomplete80ON
Expansion of Transit Fleet to Support Service Growthconstruction79ON
Upgrades to the Woodward Water Treatment Plantcomplete42ON
City of Hamilton Project Bundle - Extreme Storms - Shoreline Protection Resilienceconstruction32ON
Energy Recovery - Biogas and Digestercomplete30ON
Emergency Services Training Facility/Emergency Operations Centrecomplete25ON
Westmount Recreation Centrecomplete21ON
Upgrades to the Ferguson Pumping Stationcomplete20ON
Design, Planning and Site Preparation of New Maintenance & Storage Facility in lower Hamiltoncomplete17ON
Lower Stoney Creek Recreation Centrecomplete13ON
Replacement of Birch Avenue Bridge and Associated Road Works/Construction of Salt Management Facilityconstruction12ON
Mountain Trunk Storm Sewer - Structural rehabilitation and repairs of 400 meters of 4.5 meter by 5.4 meter arch shaped concrete storm sewer to prevent imminent collapsecomplete10ON
Fleet Expansion as per Ten Year Local Transit Strategy, 2017 (5) and 2018 (11)complete10ON
Morgan Firestone Arena Twinningcomplete10ON
Construction of Active Transportation Connectionsconstruction9.8ON
Dispatching and Automatic Vehicle Location Hardware and Software Replacementconstruction9.0ON
Hillcrest Water Reservoir Upgradescomplete8.6ON
Transit shelter and bus stop rehabilitation and development of technical guidelinecomplete7.0ON
Vehicle hoist replacements (22) and 3 new hoists at Mountain Transit Centrecomplete7.0ON
Kenilworth Water Reservoir and Pumping Station Upgradescomplete6.8ON
Wastewater System Lining - lining 20 Km of brick, concrete, clay, and Polyvinyl Chloride (PVC) sewers up to 1500mm diameter, to reduce occurrence of structural failure and back-upscomplete6.6ON
End of Line/Hard surface on-street infrastructure and Security measures and interior facility improvementscomplete5.9ON
Watermain Structural Liningcomplete5.2ON
Integrated Transit Accessible Vehiclesannounced5.0ON
Structural upgrades to Mountain Transit Centre: New transit vehicle wash racks (2) and a covered bus storage area.complete4.8ON
Stone Church Water Reservoir and Pumping Station Upgradescomplete4.5ON
Energy Retrofit - 700 Woodward Avecomplete4.5ON
Recreation Facility Roof Replacements and Retrofitscomplete4.4ON
HAAA Park Redevelopment (Hamilton Amateur Athletic Association)construction3.6ON
Construction of an Addition for the Hamilton Children's Museumcomplete3.5ON
Fleet Operator Equipment Enhancement: Replacement of Radio System and Operator Seatscomplete3.5ON
HVAC Upgrades Programconstruction3.4ON
Construction of New Corrosion Control Building at water treatment plantcomplete3.1ON
Sustainable transportation/transit connections - sidewalkscomplete3.0ON
Woodward Wastewater Treatment Plant Methane Storage Facility refurbishment and exterior repainting.complete3.0ON
Implement Priority Bus Measures along A-Line Corridorannounced3.0ON
Coronation Arenacomplete3.0ON
Sir Allen MacNab Rehabilitation Projectcomplete3.0ON
Passenger Information Technology & Software Upgradescomplete2.4ON
226 Automated Passenger Counterscomplete2.2ON
Construction of new Lynden Water Treatment Systemcomplete1.9ON
Osler Road Pumping Station Rehabilitation - Rehabilitation of the existing pumping station including all pumping equipment, all ancillary equipment and building and property improvements.complete1.5ON
Sir Wilfrid Laurier Rehabilitationcomplete1.5ON
Garage Door replacement (32) at Mountain Transit Centrecomplete1.3ON
Transit Hub Planning and Developmentconstruction1.3ON
Lister District Energy Expansion - Hamiltoncomplete1.2ON
Condition Assessment Program for Mainline Sewers throughout the Citycomplete1.1ON
Freelton Water Tower Structural Upgradescomplete1.1ON
Western Interceptor Sewer CCTV and Sonar Inspectioncomplete1.1ON
Public Service Counter Enhancementsconstruction1.0ON
Griffin House National Historic Site House and Site Restorationconstruction1.0ON
Andrew Warburton Memorial Park and Pipeline Trailcomplete1.0ON
Ben Nevis and Dewitt Water Pumping Station Upgradecomplete0.9ON
Gage Park Walkways Redevelopmentcomplete0.9ON
Transit Network Review and Installation of Transit Priority Measurescomplete0.8ON
Sewer Lateral Rehabilitation Program for private drains throughout the Citycomplete0.8ON
Heating, ventilation and air conditioning (HVAC) upgrades at Mountain Transit Centrecomplete0.7ON
Metallic Watermain Condition Assessment Programcomplete0.6ON
Healthcare Connector Cycling Routeconstruction0.6ON
Elgin Street, Rhodes Court and Calvin Street Sewage Pumping Station Rehabilitationconstruction0.4ON
Central Memorial Recreation Centre Elevator Modernization Replacementconstruction0.4ON
Support fleet (8 vehicles) to accommodate growth, including supervisor vehicles and operator shuttles and MV-1 accessible vanscomplete0.4ON
Prestressed Concrete Cylinder Pipe Condition Assessment Inspection Programcomplete0.4ON
Critical Watermain Inspection Programcomplete0.3ON
Open Streets Community Eventsannounced0.1ON
Equity Outreach to Engage Under-Represented Groups in the Integrated Active Transportation Master Plan Development for Hamiltonannounced0.1ON
Level of Traffic Stress Analysisannounced0.1ON
Protected Intersection Design Guidanceannounced0.1ON
Hamilton Active Transportation Surveycomplete0.0ON
Bikeway Wayfinding Inventory and Auditannounced0.0ON