| Construction of the Collaborative Health Education Building - Final Phase (GENERALS ONLY) | awarded | 17 | NS |
| Construction of the New Fitness Centre (GENERALS ONLY) | awarded | 17 | NS |
| Renovations and Expansion of the Student Union Building (GENERALS ONLY) | awarded | 8.7 | NS |
| T.P. #15A - Mechanical and Controls, Lemarchant Street Mixed Use Facility | awarded | 8.3 | NS |
| DAL2024-005/A. L. MacDonald (D) Building - Fire Marshall - Implement | awarded | 7.6 | NS |
| Renovations to 4th and 5th Floors, Collaborative Health Education Building (CHEB) | awarded | 6.5 | NS |
| IDEA Building, Mechanical Work, TP 4A | awarded | 5.0 | NS |
| Alexandra Hall Accessibility Renovations, Phase I, University of King's College | awarded | 4.8 | NS |
| T.P. #16A - Electrical, Lemarchant Street Mixed Use Facility | awarded | 4.7 | NS |
| Exterior Envelope Repairs (Masonry), Weldon Law Building | awarded | 4.3 | NS |
| Biomaterials Innovation Laboratory Renovation, Dentistry | awarded | 3.7 | NS |
| Biomass Systems - Supply and Services, Agricultural Campus, Truro, NS | awarded | 3.7 | NS |
| Tupper Building � Low Voltage Upgrade | awarded | 3.6 | NS |
| Extension to Warehouse Building 1459 Oxford Street | awarded | 3.6 | NS |
| D Building Envelope Conservation, Sexton Campus | awarded | 3.6 | NS |
| Renovation of the Tri-Bay Student Residence, University of King's College | awarded | 3.3 | NS |
| Drywall, Lemarchant Street Mixed Use Facility | awarded | 3.2 | NS |
| IDEA Building, Electrical Work, TP 4B | awarded | 3.2 | NS |
| Exterior Envelope Renewal and HVAC Upgrades, Cumming Hall, Agriculture Campus | awarded | 3.2 | NS |
| LSC Biology Tower Various Renovations | awarded | 3.2 | NS |
| Phase III Envelope and Interior Fit-up, Wallace McCain Learning Commons (GENERALS ONLY) | awarded | 3.1 | NS |
| Install of New Chiller and Refurbishment of Existing AHUs, Dalplex | awarded | 2.9 | NS |
| Renovations to Tupper Medical Building, Levels 1 and 2 | awarded | 2.9 | NS |
| Energy Transfer Station, Truro, NS | awarded | 2.9 | NS |
| Thermal Plant Renewal Project: Phase 1 Cooling Tower and Roof Replacement | awarded | 2.8 | NS |
| Design Build for Feed & Interpretative Centres (Ruminant Animal Centre), Agricultural Campus | awarded | 2.8 | NS |
| Exterior Conservation and Window Replacement, Cox Building, Truro NS | awarded | 2.7 | NS |
| Civil Works and District Energy Pipe Installation Only, Carleton to Sexton District Energy | awarded | 2.7 | NS |
| Arts Centre New Addition, TP 3C Formworks | awarded | 2.6 | NS |
| Aluminum, Curtainwall, Entrances and Glazing, Lemarchant Street Mixed Use Facility | awarded | 2.6 | NS |
| Exterior Masonry Renewal and Window Replacement, O'Brien Hall | awarded | 2.5 | NS |
| Modifications to Main Electrical Distribution, Weldon Law Building | awarded | 2.4 | NS |
| Exterior Envelope Conservation, Common Area, Howe Hall | awarded | 2.4 | NS |
| Structural and Mechanical Repairs and Door Replacement to Parkade, Tupper Medical Building | awarded | 2.4 | NS |
| University Club Exterior Envelope (Implementation) | awarded | 2.4 | NS |
| Level 4 Tenant Fit-Up, Steele Ocean Sciences Building (SOSB) | awarded | 2.3 | NS |
| HVAC and Switchgear Renewal Implementation, Langille Athletic Centre | awarded | 2.3 | NS |
| Washroom Renovations, Cameron, Henderson & Bronson House, Howe Hall | awarded | 2.2 | NS |
| Arts Centre TP 2D Mechanical | awarded | 2.2 | NS |
| Collaborative Health Education Building (CHEB) Siteworks and Foundations | awarded | 2.1 | NS |
| Interior Renovations, Exterior Envelope Modifications and HVAC Upgrades, Boulden Building | awarded | 2.1 | NS |
| MacRae Library Second Floor Renovations, Agricultural Campus, Truro NS | awarded | 2.1 | NS |
| Arts Centre New Addition, TP 3F Electrical | awarded | 2.1 | NS |
| Fume Hood Ventilation Upgrade, Haley Building, Truro, NS | awarded | 2.1 | NS |
| Dal 2024-013 NEC TP5.5 Steel Stud, Drywall and Ceilings | awarded | 2.1 | NS |
| Washroom Renovations, Newcombe Wing, Shirreff Hall | awarded | 1.9 | NS |
| Supply Construction Management Services for the IDEA Innovation and Design Hub | awarded | 1.8 | NS |
| Extension to Loading Dock, Dentistry Building | awarded | 1.8 | NS |
| Arts Centre New Addition, TP 3E Mechanical | awarded | 1.8 | NS |
| CHEB Structural Steel | awarded | 1.7 | NS |
| IDEA Building, Drywall and Ceilings Work, TP 6A | awarded | 1.7 | NS |
| Dental Lobby Renovations | awarded | 1.7 | NS |
| Exterior Envelope Conservation Project, Henry Hicks Building (Masonry and Window Repairs) | awarded | 1.6 | NS |
| Residence Renovations to Kitchen and Dining Area, Howe Hall | awarded | 1.6 | NS |
| Arts Centre, TP 1A Excavation, Backfill, and Civil Site Works | awarded | 1.6 | NS |
| Supply Construction Management Services for the Faculty of Dentistry Clinic Renewal | awarded | 1.5 | NS |
| Exterior Envelope Conservation Project, Henderson House, Howe Hall | awarded | 1.5 | NS |
| Energy Transfer Station Installation Only, Carleton to Sexton District Energy | awarded | 1.5 | NS |
| Wickwire Field Renewal | awarded | 1.5 | NS |
| DAL2023-015 New Event Centre - Roofing T.P.# 5.4 | awarded | 1.5 | NS |
| IDEA Building, Structural Steel & Miscellaneous Metals, TP 2F | awarded | 1.4 | NS |
| Renovations to Morgue and Central Stores, Tupper Medical Building | awarded | 1.4 | NS |
| Replacement of Shingled Roof, Forrest Building | awarded | 1.4 | NS |
| Masonry Repairs and Glazing Upgrades, F Building, Sexton Campus | awarded | 1.4 | NS |
| Elevator Maintenance and Service | awarded | 1.4 | NS |
| Renovations to Corridors, 1st and 2nd Floors, New Eddy Wing, Sherriff Hall | awarded | 1.4 | NS |
| Exterior Envelope Conservation, G Building, Sexton Campus | awarded | 1.4 | NS |
| IDEA Building, Curtainwall, Entrances Work and Interior Glazing TP 3A.1 | awarded | 1.4 | NS |
| Offices and Laboratory Renovations, Burbidge Building | awarded | 1.3 | NS |
| Installation of Two (2) Fluid Coolers, Dentistry Building | awarded | 1.3 | NS |
| Implementation of Fire Alarm Panel and Devices Renewal and Emergency Lighting and Signs Upgrades, Dentistry, Burbidge and Forrest Buildings and PA System Upgrades for Dentistry | awarded | 1.3 | NS |
| Demolition of Structures and Excavation for the New Fitness Centre | awarded | 1.3 | NS |
| Greenhouse Exterior Envelope Improvements, Biology, Life Science Centre | awarded | 1.3 | NS |
| Arts Centre New Addition, TP 3W Drywall | awarded | 1.3 | NS |
| Level 3 Tenant Fit-Up, Steele Ocean Sciences Building | awarded | 1.2 | NS |
| Install Only Biomass Cogen South Campus District Piping System and Early Site Services, Agricultural Campus | awarded | 1.1 | NS |
| Boiler Room South Roof Replacement, Central Services Building | awarded | 1.1 | NS |
| Renovations to the Ralph Medjuck (H) Building Addition | awarded | 1.1 | NS |
| IDEA Building, Exterior Masonry - TP # 3B | awarded | 1.1 | NS |
| Emergency Showers Project, Cox Institute West, Agricultural Campus | awarded | 1.0 | NS |