Canadian Infrastructure Atlas
/
65,333 projects from 14 public sources · updated 2026-09-30 · sources · what’s covered
Owners

Carleton University

Projects and bid results published under this name. If a province doesn’t release bid results, the bidding numbers here will be blank.

Projects
119
0 still underway or upcoming
Value on record
$0.0 B
Tenders with bids
—
119 tracked projects

Largest projects

ProjectStageValue ($M)Prov.
The Gas Tax and Infrastructure Funding: An Examination of Governance Structures and Spending Patternscomplete0.2ON
Prioritizing Local Infrastructure Needs: The Role of Municipal Government and Community Networks in Building Local Governance Capacitycomplete0.1ON
Development of a Model Process to Use the Outputs of Infrastructure Assets Management in Support of Municipal Corporate Objectives and Visioncomplete0.1ON
Demolition of P9 Parking Garage, restoration of the demolition site, and construction of a new room in the tunnelcomplete—ON
PK-183640 - Fire Sprinkler Systemcomplete—ON
2025 Roof Replacement - H.H.J. Nesbitt Buildingcomplete—ON
air intake and exhaust localized concrete and grating repairscomplete—ON
Perimeter Security Updatescomplete—ON
Azrieli Pavilion, Material Engineering Lab, Carleton Universitycomplete—ON
CU Perimeter Security - 21DTcomplete—ON
Mackenzie Building Lab Renovationcomplete—ON
New Mechanical Access Paltformscomplete—ON
Carleton University - Lanark and Renfrew Houses Flooring Replacement - Project 192758complete—ON
UV Filtration Group 5 added to existing air handling units for (8) buildings located at Carleton University: Maintenance, Robertson Hall, Paterson Hall, Steacie, Architecture, Nideyinen, Nesbitt, NW Researchcomplete—ON
Prescott House Electrical Upgradescomplete—ON
NWRC Stormwater Pump Stationcomplete—ON
Cooling Tower Replacementcomplete—ON
UV Filtration added to existing AHU for 5 residences located at Carleton University: Prescott, Renfrew, Lanark, Glengarry, Leeds (Group 8)complete—ON
Interior Alterations to a 5 storey institutional building (RichcraftKitchen and Dining area renovations)complete—ON
Herzberg Building Renewal Stairs 2024complete—ON
Artificial Turf Field Replacement - Raven's Fieldcomplete—ON
UV Filtration added to existing air handling units for (4) buildings located at Carleton University: Arise, Azrieli Pavilion, Canal & HCI & VSIMcomplete—ON
Campus Gateway Signage Renewalcomplete—ON
UV Filtration added to existing air handling units for four buildings located at Carleton University: Loeb, Dunton Tower, St. Patrick's and Richcraft Hall (group 3),complete—ON
Installation of new Generatorcomplete—ON
2024 Roof Replacement - Paterson Hall & Canal Buildingcomplete—ON
CU Perimeter Security - 13 HPcomplete—ON
Steacie Tower Vent Column Repaircomplete—ON
Air Intake and Exhaust Shaft/Grate Repairscomplete—ON
Dunton Tower Fire Alarm and Smoke Control Modifications - Project # 154988complete—ON
Carleton University, Teraanga Commons Kitchen & Dining Projectcomplete—ON
Steacie Building, Clean Room Suite 334, Carleton Universitycomplete—ON
Azrieli Pavilion Room 338 Laser Labcomplete—ON
2024 Roof Replacement - Herzberg Buildingcomplete—ON
2024 Roof Replacement - Human Computer Interaction Buildingcomplete—ON
Annual structural repair and maintenance works at the pool facilitycomplete—ON
retrofit of hte open space on the 4th floor to accommodate an accessibility laboratory. 4500sq/ft of interior space fit up to include new wall systems, flooring, ceilings, lighting, new mechanical systems plumbing to accommodate persons with accessibility challengescomplete—ON
Installation of UV-C Lightscomplete—ON
Faculty of Engineering and Design Fumehood installationcomplete—ON
Colonel By Daycare addition and renovationcomplete—ON
Stormont-Dundas Mechanical Upgradescomplete—ON
150360B, Rehabilitation of Sewer and Watermain Structurescomplete—ON
Campus wide UV-C Filtration Program, Group 2B which includes Herzberg and Health Sciences Buildingcomplete—ON
UVC Filtration Units in Tory Building, MacOdrum Library, Southam Hallcomplete—ON
CU Health Canada Doorcomplete—ON
Loeb Building 3rd Floor, Geography Department Fitupcomplete—ON
Nideyinan Stair Modificationscomplete—ON
XX-155232 P.A. Quad Improvementscomplete—ON
Herzberg Building Block A Window Replacementcomplete—ON
Installation of on site generatorcomplete—ON
2023 Roof Replacement - Lanark Housecomplete—ON
2023 Roof Replacement - Prescott Housecomplete—ON
2023 Academic Roof Replacementcomplete—ON
2023 P18 Level 3 Waterproofing Replacementcomplete—ON
Exterior Stairs Replacementcomplete—ON
XX-166981: P7 Expansion Phase 2complete—ON
Carleton University, Card Access Stormont Dundas Residence and Glengarry House Metal Doorscomplete—ON
Carleton University, Southam Hall Virtual Reality Labscomplete—ON
Lab 214 Ventilationcomplete—ON
Electrical Cryoplant Upgradecomplete—ON
CU ML GIS Data Lab and Transition Space Fit-Upcomplete—ON
Blower Wheel Replacement - Dunton Tower Mechanical Roomcomplete—ON
RTU Replacementcomplete—ON
2022 Annual Pool Repairscomplete—ON
HIVE workspace renovationcomplete—ON
Loeb Building Exit Stair Remediationcomplete—ON
Envelope Repairs - Phase 2 (Lintel Repairs)complete—ON
Paterson Hall Soffit Restorationcomplete—ON
Future Learning Lab - 4th floor modifications/refit of spacecomplete—ON
Renovation of existing office suite on 3rd floor of CTTC Building on Carleton Campus, including the addition of three new offices, and associated relocations of existing mechanical and electrical systems to suit the Centre for Indigenous Initiatives.complete—ON
Macodrum Library, Data center expansioncomplete—ON
2022 Roof Replacement - Carleton University - Ice Housecomplete—ON
Project 143106 - Campus High Voltage Testing Programcomplete—ON
New insulated exterior soffit above main entry level and minor interior renovations on 3rd and 17th floorscomplete—ON
Architecture building Skylight #1 & #2 replacementcomplete—ON
2022 P9 Garage Repairscomplete—ON
Macodrum Library Level 2 Interior Renovationscomplete—ON
2022 Roof Replacement - Minto CASE Buildingcomplete—ON
Provide Electrical work at above location.complete—ON
Rehabilitation of the O-Train Overpass including replacement of the pedestrian barriercomplete—ON