BC Hydro

Projects and bid results published under this name. If a province doesn’t release bid results, the bidding numbers here will be blank.

Projects
62
54 still underway or upcoming
Value on record
$21.6 B
Tenders with bids
—
62 tracked projects

Largest projects

ProjectStageValue ($M)Prov.
Site C Projectconstruction16,000BC
John Hart Dam Seismic Upgrade Projectconstruction912BC
Prince George to Terrace Capacitors Projectconstruction582BC
Ladore Spillway Seismic Upgrade Projectconstruction373BC
Peace to Kelly Lake Stations Sustainment Projectconstruction344BC
Bridge River 1 Replace Units 1-4 Generators / Governors Projectprocurement311BC
Prince George to Terrace Capacitors Project: Enabling Electrification of Industryconstruction194BC
Mica - U1 - U4 Circuit Breaker and Iso-phase Bus Replacement Projectconstruction176BC
Treaty Creek Terminal - Transmission Load Interconnection (KSM) Projectconstruction168BC
Fleetwood - Distribution Load Interconnection (SLS Servicing) Projectconstruction158BC
Mainwaring Station Upgrade Projectconstruction154BC
Ruskin - Left Abutment Sinkhole Remediation Projectconstruction129BC
Peace Region Electricity Supply Projectcomplete115BC
Natal - 60-138 kV Switchyard Upgrade Projectconstruction101BC
2L143 - Cable Replacement Projectconstruction100BC
Northwest - Substations Outage Mitigation Projectconstruction89BC
Long Lake Terminal Station - Transmission Load Interconnection Projectconstruction80BC
Materials Classification Facilityconstruction76BC
Sperling Substation Metalclad Switchgear Replacement Projectconstruction76BC
Kimberley to Marysville - Substation Relocation Projectconstruction73BC
Minette - Transmission Load Interconnection Projectconstruction72BC
Kootenay Canal Modernize Controls Projectconstruction61BC
Vancouver Island Radio System Projectconstruction58BC
Burrard Switchyard - Control Building Upgrade Projectconstruction57BC
Mica Modernize Controls Projectcomplete56BC
Comox-Puntledge Flow Control Improvements Projectconstruction53BC
Fraser Valley (CBN and MLN) - Capacitive Reinforcement Projectconstruction48BC
Norgate - Offload NOR loads to NVR feeders (LM-NSH-074)construction48BC
W.A.C. Bennett Dam Seal Low Level Outlets Projectconstruction48BC
Various Sites - Transmission Load Interconnection Projectconstruction47BC
Synchronous Condenser (SC) Excitation Systems Upgrade - Vancouver Island Terminal (VIT)/ Kelly Lake (KLY) Projectconstruction47BC
Anahim Lake - Station Upgrades for Renewable Energy Integration Projectconstruction44BC
Kidd No. 1 - Substation Upgrade Projectconstruction42BC
Cheakamus Recoat Units 1 and 2 Penstocks (Interior and Exterior) Projectconstruction42BC
Fleetwood - Distribution Feeder Ductbank and Feeder Installation (FV-FVW-023)construction41BC
Three Fleetwood Feeders to Offload McLellan (FV-FVW-723) Projectconstruction41BC
Mica Upgrade Heating Ventilation Air Conditioning (HVAC) System Projectconstruction40BC
Oil Management Department Tank Farm Upgrade Projectconstruction38BC
Mica Townsite Studio Dorms Projectcomplete34BC
Mica Upgrade 600V Circuit Breakers Projectconstruction32BC
Various Sites - Reservoir Booms Replacement Projectconstruction29BC
Hugh Keenleyside - 90 Tons Crane Upgrade Projectconstruction26BC
Ah-sin-heek - Substation Replacement Projectconstruction26BC
Jordan - Upgrade Governor & Pressure Regulating Valve (PRV) Controls Projectcomplete24BC
BC Hydro - Customer Connection Project: Creative Energy Decarbonizationconstruction23BC
Nicomekl - Distribution Load Interconnection Projectconstruction21BC
Mica - Little Chief Inclinometers Installation Projectconstruction20BC
North Vancouver - Offload North Vancouver (NVR) Loads to Lynn Valley (LYN) New Feeders (LM-NSH-075) Projectconstruction20BC
Juene Landing - 1L130 to 25kV Conversion with Neutral Conductor and Bypass (VI-PHY-008) Projectconstruction19BC
Williams Lake Interiors Projectcomplete19BC
Joseph Creek (JOE) Substation Upgrade Projectcomplete19BC
BC Hydro Customer Connection Project: ARC Resources Electrificationannounced18BC
Valemount New Office, Warehouse & Truck Baysconstruction17BC
Oldfield - Substation Feeder Section Upgrade Projectcomplete17BC
Various Sites - Mobile Diesel Generator Supply and Install (M193-M196) Projectconstruction17BC
Control PLC984 and RTU Replacement at Williston Substation (WSN) Projectconstruction17BC
Revelstoke - Marble Shear Block Rock Fall Mitigation/Instrumentation Projectconstruction16BC
G.M. Shrum (GMS) Substation Control Systems Upgrade Projectconstruction16BC
BC Hydro Customer Connection Project: Crew West Septimus and Groundbirch Electrificationconstruction15BC
Natal and 1L274 - Transmission Reinforcement (Teck) Projectconstruction15BC
Peace to Kelly Lake - Remedial Action Scheme Upgrade Projectcomplete15BC
BC Hydro Customer Connection Project: Capilano University Electrificationannounced2.7BC